| Asphalt Weather Risk
Precipitation
- Significant rain during the hours before paving -- Contractor cannot pave until
base is dry
- Significant rain during paving -- Contractor cannot pave
Low Temperatures
- Frozen ground -- Contractor cannot pave
- Temperatures below 32 during paving -- Contractor cannot pave
- A decrease in the length of the working season due to early/late frozen ground in
the fall/spring
|